Two-zone loading
For highly efficient two-zone loading of a buffer cylinder by a heat generator with minimum circulation in heating mode and with priority DHW heating
Specialist partner access required
Specialist partner access required
Specialist partner access required
BAFA funding opportunity for heating system optimization through hydraulic balancing and the installation of separate control technology<br/>rendeMIX double-switch valve consisting of two DN32×G1½(a) Ms58 3-way switching valves, valve body and cover Ms58<br/>For highly efficient two-zone charging of a buffer tank by a heat generator with minimum circulation in heating mode and during priority domestic hot water production<br/>2 EMS 90-2P actuators, 230 V AC, 50 Hz, 2.3 VA, 2-point signal, 6 Nm (240 h), 90°, 60s, right-closing, gray adapter<br/>Switching assembly with 4 connections to the buffer tank, Cu Ø35×1, pipe spacing to the heat generator 200 mm, Pipe spacing to buffer tank 100 mm, DN32×G1½(a) flat<br/>1 integrated gravity brake/backflow preventer, Dp 10 mbar<br/>Generator circuit (NT): Kvs = 9.4 × V'max[250 mbar] = 4.7 m³/h × Q'max[20 K] = 109 kW × Q'max[10K] = 55 kW × Leak rate < 0.1%<br/>6 thermometers 0–120°C, Ø63 mm, solder sleeves Ms58<br/>6 ball valve fittings, straight-through DN25, PN32, G1½(i)×Rp1 flat-seal, stuffing box, sealing hole, spindle with aluminum wing handle
EPP insulation shell, 40 g/l, black, 450×450 mm, Quick-assembly kit<br/>Without pump flanges<br/>Assembly does NOT include pump compensator – PAS L180 (Part No.: 001 338)<br/>Assembly does not include a pump<br/>Model DN 25 – lightweight version, PN 10 bar, Tmax 120°C
Generator circuit (NT): Kvs = 9.4 • V'max[250mbar] = 4.7m³/h • Q'max[20K] = 109kW • Q'max[10K] = 55kW • Leakage rate < 0.1%