Hans-Georg Baunach

Hans-Georg Baunach

Management

28 Jul 2026

rSTOR C - buffer tanks made this simple - An image gallery

Every installation step from our manual – right next to the real site photo

We promise simple and fast installation – and we would rather show you than merely claim it. On the left you see the respective step from our installation manual, on the right the real photo from the site of our specialist partner Rudi Schlittenhardt GmbH & Co. KG from the northern Black Forest.

The finished product

Fully installed rSTOR C with flange-mounted pump and valve assemblies and the Baunach hydraulic diagram on the tank

The result: a tidy distribution centre, completely ready for connection, with directly flange-mounted and shut-off pump and valve assemblies – and the Baunach hydraulic diagram on the tank.

Finished heating system with rSTOR C in the plant room

The rSTOR C: compact assemblies, clearly structured, perfectly insulated, highly efficient …

Close-up of the rendeMIX assembly on the fully insulated rSTOR C

… and easy on the eye, too.

Happy customers and satisfied specialist partners

Two satisfied specialist partners giving a thumbs up in front of the installed rSTOR C

Everyone is happy to be photographed in front of this: thumbs up for Schlittenhardt!

Janek Schlittenhardt giving a thumbs up in front of the installed rSTOR C

Janek Schlittenhardt confirms it too:

“The rSTOR C: compact, efficient and multivalent!”

The Baunach rSTOR C at a glance

Simple and fast installation

Less space required

High-quality insulation in energy efficiency class B

Optimal stratification for maximum comfort and cost-effectiveness

Available from stock

Demonstrably up to 50 % higher annual performance factors with heat pumps. Available from stock in the 800 and 1000 litre sizes.

to the rSTOR C